Nexscope

Create Patent Risk Reports to Assess Product Compliance

11 views 0 triesMay 28, 20260
Patent Report GeneratorPatent and IP Risk
User
Create a patent risk report for this storage box product.
Assistant
Assistant

Patent Risk Report — Storage Box

Executive Summary

MetricValue
Overall Risk Score89.3 / 100 🔴 CRITICAL
Risk LevelCRITICAL
Max Design Patent Similarity91.9%
Max Utility Patent Similarity79.3%
High-Risk Patents Identified76
Total Patents Analyzed80 (50 design + 30 utility)

Recommendation: DO NOT PROCEED without design modifications. High visual similarity to existing design patents detected.


Important Nuance

While the similarity scores are very high, all top 10 matching patents currently show "Inactive" legal status. This significantly reduces the actual enforcement risk — expired or lapsed patents cannot be asserted. However, the sheer volume of similar designs suggests this product form factor is well-covered in the patent landscape, and some active patents may exist beyond the top matches.


Geographic Risk Map

MarketStatusPatent Count
🇨🇳 China⚠️ Patents found45
🇺🇸 United States⚠️ Patents found4
🇯🇵 Japan⚠️ Patents found4
🇪🇺 European Patent (EP)✅ No patents found0

Top 5 Highest-Risk Patents

#Patent NumberTitleAssigneeSimilarityStatus
1CN308866823SStorage box (collection)茶花现代家居用品91.9%Inactive
2WO087960SStorage boxesABM ITALIA S.P.A.91.0%Inactive
3DE4020232014110009SContainers for storageARNULF BETZOLD GMBH90.5%Inactive
4WO210081SPlastic storage boxROTHO KUNSTSTOFF AG90.4%Inactive
5EU0018133380011SContainers for foodEMSA GMBH90.3%Inactive

Recommendations

  1. Lower actual risk than score suggests — the top matches are all inactive/expired. Verify their exact expiration dates before making a final decision.
  2. China market caution — 45 related patents found; if selling on CN platforms, confirm no active design patents remain in force.
  3. Consider minor design modifications — rounding lid corners, changing handle shape, or altering proportions would reduce similarity to existing filings.
  4. EP market appears safest — no matching patents identified for European entry.
  5. Consult a patent attorney if proceeding in US, CN, or JP markets to confirm inactive status of flagged patents.

Data Source: Zhihuiya (170M+ patents, 150+ countries) | Generated 2026-05-28 | For reference only, does not constitute legal advice.